TM 11-6625-444-14-2
Section III. PREPARATION FOR MOVEMENT
c. Grasp the voltmeter and transport it to
the
desired location.
This section contains information regarding
3-16. Rack Removal (Optional Rack Installation)
d e s c r i b e d first, followed by i n s t r u c t i o n s for
bench or shelf movement.
a. Set the POWER OFF/ON switch to OFF by
releasing it to the out position.
3-15. Bench/Shelf Movement
b. Disconnect any test leads or cables from
the front and rear panel terminals, if necessary.
a. Set the POWER OFF/ON switch to OFF by
releasing it to the out position.
c. Remove the voltmeter from the equipment
r a c k by removing the front mounting screws
b. Disconnect any test leads or cables from
the front and rear panel terminals, if necessary.