Home
Download PDF
Order CD-ROM
Order in Print
Electronic Voltmeter AN/URM-145
Section I. SPECIFICATIONS: VOLTMETER, ELECTRONIC AN/URM-145
Section II. GENERAL DESCRIPTION
GENERAL DESCRIPTION (cont)
Figure 1. Input Resistance of RF Probe
Figure 2. Input Capacitance of RF Probe (Measured at 10 Mc)
Figure 4. METHOD FOR MAKING LOW INDUCTANCE CONNECTIONS TO TEST SIGNAL POINT DIRECTLY USING THE RF PROBE
Section III. OPERATING PROCEDURE.
Measurement Procedure
Operatinq Precautions
Hum, Noise, and Spurious Pick-up
Section III.1 PREVENTIVE MAINTENANCE INSTRUCTIONS
Preventive Maintenance Checks and Services
Operator's Daily Preventive Maintenance Checks and Services Chart - TM-11-6625-524-15-10028
Organizational Weekly Preventive Maintenance Checks and Services Chart
Organizational Monthly Preventive Maintenance Checks and Services Chart
Organizational Quarterly Preventive Maintenance Checks and Services Chart - TM-11-6625-524-15-10031
Cleaning - TM-11-6625-524-15-10032
Section IV. THEORY OF OPERATION
Section V. MAINTENANCE
Calibration Check Procedure
Voltage and Resistance Tests
Table 1. Test Point Voltage
Table 2. Test Point Resistance
Table 3. Calibration Adjustment Procedure
Section VI. SHIPPING INSTRUCTIONS
Appendix A. REFERENCES - TM-11-6625-524-15-10041
Appendix B. BASIC ISSUE ITEMS
Maintenance code - TM-11-6625-524-15-10043
Federal Supply Codes
Section II. Basic Issue Items List - TM-11-6625-524-15-10045
Appendix C. MAINTENANCE ALLOCATION - TM-11-6625-524-15-10046
Explanation of Format for Tool and Test Equipment Requirements
Section II. Maintenance Allocation Chart - TM-11-6625-524-15-10048
Section III. Tool and Test Equipment Requirements - TM-11-6625-524-15-10049
Schematic Diagram - Voltmeter, Electronic, AN/URM-145
TM-11-6625-524-15-1 Voltimeter Electronic AN/URM-145 Manual