SHIPMENT, LIMITED STORAGE, AND DEMOLITION
TO PREVENT ENEMY USE
Section I. SHIPMENT A N D L I M I T E D S T O R A G E
46. Disassembly of
Equipment
a. O p e r a t e a l l s w i t c h e s a n d t h e i r c o n t r o l s t o t h e i r s a f e t y p o s i -
t i o n s (par. 15d) and disconnect the tube tester from the ac power
supply.
b. Remove the power cord plug from the ac source.
c. W i n d t h e p o w e r c o r d a r o u n d t h e b r a c k e t s o n t h e f r o n t p a n e l
and insert the plug into the dummy power cord receptacle that
is mounted on the front panel.
d. Close the case and latch it securely.
47. Repackaging for Shipment or
Limited Storage
The exact procedure for repackaging depends on the material
available and the conditions under which the equipment is to be
shipped or stored. Adapt the procedures outlined below whenever
circumstances permit. The information concerning the original
packaging (pars. 8 and 9) will also be helpful.
a. Material Requirements. The following materials are required
for packaging the tube tester. For stock numbers of materials,
c o n s u l t SB 38-100.
Material
Quantity
18 sq ft
Waterproof wrapping paper ---------------------------------
Fiberboard, corrugated, single-face (flexible) ------------------
35 sq ft
Tape, pressure-sensitive adhesive, waterproof (3-inch) ---------------
12 ft
Tape, paper, gummed (sealing and securing) (3-inch) __________
10 ft
Strapping, flat, steel (5/8 - x 0.02-inch)
_ __ __ ____________
13 ft
Strapping seals -------------------------------------------------------
2 each
Wooden shipping box (19 x 18 x 10
inches inside dimen-
1 ea
sions).