TM
11-6625-291-14/TO
33A1-7-23-1
Section V FINAL TESTING
Page
Subject
Para
Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Final Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-27. OVERVIEW.
Final testing must be performed after maintenance procedures for the output meter have been
completed.
All final testing procedures in this section refer to Output Meter TS-585D/U. The same procedures
apply to Output Meters TS-585A/U, TS-585B/U, and TS-585C/U.
Output Meter TS-585A/U is accurate to within 10 percent at half scale. Ten percent is approximately
2 1/2-scale divisions. 0utput MetersTS-585B/U, TS-585C/U, and TS-585D/U are accurate to within
5 percent at half scale. Five percent is approximately 1 1/2-scaledivisions
6-28. FINAL TESTING.
This task covers:
2. Testing of meter multiplier circuit
INITIAL SETUP
Equipment Condition
Tools
None
Output meter on workbench
Test Equipment
Materials/Parts
None
AN/URM-90
Personnel Required
Meter Test Set TS-682/GSM-1
One technician
ACTION
REMARKS
ITEM
LOCATION
Connect.
1. Output meter
Test set (1) and
Be sure to connect ground lead to G.
binding posts (2)
6-48