TM 11-6625-291-14/TO 33A1-7-23-1
6-17. REPLACEMENT OF METER.
This task covers:
1. Removal
2. Installation
INITIAL SETUP
Personnel Required
Tools
One technician
Tool Kit, Electronic Equipment
TK-105/G
Equipment Condition
Materials/Parts
Meter, audio level
Output meter on workbench
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
Using wrench, remove.
1. Meter
Hex nuts (l), flat
washers (2) and
leads (3)
Using flat-tip screwdriver, remove.
Terminal board (4)
2. Chassis, front
mounting screws (5)
3.
Lift out.
Meter (6)
Return to supply.
INSTALLATION
Put meter in place.
Meter (6)
1. Chassis, front
2.
Using flat-tip screwdriver, install.
Mounting screws (5)
and terminal
board (4)
Using 3/8-inch wrench, install.
3. Meter
Leads (3), flat
washers (2) and
hex nuts (1)
NOTE
6-28