TM 11-6625-2616-14
INSTALLATION
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
on the packing slip. If a packing slip is not avail-
able, check the equipment against the mainten-
a. Packaging Data. When packed for ship-
ance allocation chart (app B). Report all dis-
ment, the AN/GSM-64A is placed in a carton,
crepancies in accordance with TM 38-750.
wrapped and sealed in scrim foil, and packed
Shortage of a minor assembly or part that does
in a shipping box. A typical shipping container
not affect proper functioning of the equipment
should not prevent use of the equipment.
test lead and test lead set are each packed in a
cardboard box and placed on top of the carton
c. If the equipment has been used or recondi-
containing the instrument. The technical manual
tioned, see whether it has been changed by a
is placed in a waterproof wrapper and is also
modification work order (MWO). If the equip-
packed on top of the carton containing the in-
ment has been modified, the MWO number will
strument. The outside dimensions of the ship-
appear on the rear panel near the nomenclature
ping box are 20 3/8 by 11 3/4 by 9 3/4 inches.
plate. If modified, see that any operational in-
The volume of the box is 1.35 cubic feet, and
struction changes resulting from the modifica-
the shipping weight is 18 pounds.
tion have been entered in the equipment manual.
b. Removing Contents.
NOTE
(1) Cut tape on top of outer carton and
Current MWO's applicable to the equip-
fold back flaps.
ment are listed in DA Pam 310-7.
(2) Remove technical manual and boxes
containing test lead and test lead set.
2-3. Installation of
Equipment
(3) Remove inner carton and remove scrim
The digital voltmeter is portable and self-con-
foil from around carton.
tained, and requires no installation other than
(4) Cut tape on top of carton and fold back
tilt-stand adjustment, power connection to a
flaps.
suitable ac power source, and assurance that the
(5) Remove cushioned top and instrument
from carton.
a. Tilt-Stand. The carrying-handle of the in-
(6) Remove desiccant bag from carton.
strument also serves as a tilt-stand for the unit.
(1) Slightly loosen (turn counterclockwise)
NOTE
the two knobs attaching the handle to the frame
Do not dispose of original packing ma-
of the instrument.
terials. Retain for use in repacking
(2) Raise the front of the instrument and
equipment for storage or shipment.
pull the front of the handle forward and then
press downward and underneath the unit until
2-2. Checking Unpacked Equipment
the front of the handle (now the base of the
a. Inspect the equipment for damage incur-
stand) is in such a position to provide the desir-
red during shipment. If the equipment has been
ed angle to the instrument for easy observation
damaged, report the damage on DD Form 6
of the digital readout.
(3) Tighten the two knobs attaching the
stand to the frame.
b. See that the equipment is complete as listed