TM 11-6625-291-14/TO 33A1-7-23-1
6-8. REPLACEMENT OF BINDING POST ASSEMBLY.
This task covers:
1. Removal
2. Installation
INITIAL SETUP
Personnel Required
Tools
Tool Kit, Electronic Equipment
One technician
TK-105/G
Equipment Condition
Materials/Parts
Output meter on workbench
Post, binding
See TM 11-8625-291-24P
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
NOTE
Leads (1)
1 . Chassis
leads.
Using 3/8-inch wrench, remove.
Nuts (2), lock-
2.
washers (3) and
insulator plate (4)
Remove.
Binding post (5)
3.
INSTALLATION
Install.
Binding post (5)
1 . Chassis
Insulator plate (4),
2.
Using 3/8-inch wrench, install.
Iockwashers (3)
and nuts (2)
Leads (1)
3.
tags.
6-10